- Located only 23 km east of Crawford Nickel Sulphide Project, and 23 km south of Cochrane. Year-round access and infrastructure.
- Almost twice the size of Crawford based on the outline of its geophysical target of 3.1 km2 (vs 1.6 km2 at Crawford)
- Indicated Resource totals 237 Mt at 0.22% nickel, and inferred Resources total 537 Mt at 0.21% nickel. The MRE is approximately 2.4 km long, up to 700 metres wide, and 500 metres deep.


Resources & Geology

- Mann Central, 32 holes drilled to date for a total of 12,563 metres of core.
- Nickel mineralization hosting predominantly in peridotite, while PGE anomalous values are hosted in pyroxenite dykes
- Mineralogy at Mann Central has been characterized by analyzing 384 samples with TIMA (Tescan integrated Mineral Analyzer).
- Mineralogy confirms Mann Central recoverable nickel mineralization is hosted predominantly in pentlandite and heazlewoodite in similar amounts.

In Pit Resources size comparison between Mann Central and Crawford deposits

