Canada Nickel Company (117)

Mann Central

  • Located only 23 km east of Crawford Nickel Sulphide Project, and 23 km south of Cochrane. Year-round access and infrastructure.
  • Almost twice the size of Crawford based on the outline of its geophysical target of 3.1 km2 (vs 1.6 km2 at Crawford)
  • Indicated Resource totals 237 Mt at 0.22% nickel, and inferred Resources total 537 Mt at 0.21% nickel. The MRE is approximately 2.4 km long, up to 700 metres wide, and 500 metres deep.
Mann Central Resourceson Mag Sus Mann Central Page Slide 19 Left
Cnc Regional Properties Mann Central Page Slide 19 Right

Resources & Geology

Mann Ce Resource
  • Mann Central, 32 holes drilled to date for a total of 12,563 metres of core.
  • Nickel mineralization hosting predominantly in peridotite, while PGE anomalous values are hosted in pyroxenite dykes
  • Mineralogy at Mann Central has been characterized by analyzing 384 samples with TIMA (Tescan integrated Mineral Analyzer).
  • Mineralogy confirms Mann Central recoverable nickel mineralization is hosted predominantly in pentlandite and heazlewoodite in similar amounts.
Mann Central Crawford Comp Mann Central Page Slide 20


In Pit Resources size comparison between Mann Central and Crawford deposits

Logo Pipeda
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.