Canada Nickel Company (117)

Texmont

  • Accessible year-round by road, located 35 km southeast of Timmins
  • Texmont property had a brief production phase from July 1971 to December 1972. It is estimated that 75,000 to 100,000 tons of ore were milled at an average grade of 0.9-1.0% nickel. The operation targeted narrow, high-grade nickel mineralization. The mine shutdown in 1972 primarily due to low nickel prices and high fuel prices.
  • The initial MRE incorporates drilling data containing 145 holes from two campaigns developed by CNC  (2022-2023) and Fletcher Nickel (2006-2008)
Cnc Regional Texmont Slide 28 Left
Cnc Regional Properties Texmont Slide 28 Right

Resources & Geology

Image

In Pit Resource estimate for the Textmond Nickel Deposit 

  • MRE was calculated using 144 holes, (44,528 m)  completed by Canada Nickel and Fletcher Nickel.
  • Measured Resource total 3.3 Mt at 0.34% nickel, Indicated Resources total 34.6 Mt at 0.27%nickel, and Inferred Resources total 57.7 Mt at 0.22% nickel
  • Mineralogy is hosted by komatiitic peridotite flows that have been serpentinized and locally carbonated.
  • Sulphide Mineralogy consists mainly of pentlandite and pyrrhotite with minor millerite, heazlewoodite, pyrite and chalcopyrite. Mineralization occurs as net-textured to locally semi-massive at the high-grade core, surrounded by a medium to low grade envelope with disseminated fine grained sulphides.
Cnc Categorized Texmont Mineral Resources (left) And The %ni Grade (right) Slide 29

CNC Categorized Texmont Mineral Resources (left) and %Ni Grade (right)

Logo Pipeda
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.